Therefore, Action Against Hunger requested interested contractors to submit their company profile that contain at least the below listed mandatory documents:
1. Administrative documents (Copy)
a) Valid Trade renewed Registration Licence b) Valid Business Licence c)
Tax Identification number (TIN) Certificate d)
Value Added Tax Certificate e) Valid GC/WWC Contractor License Grade WWGC-5 and above
2. Technical documents (Copy)
a) Similar construction work experience in the past five years from different organizations and certificate of successful completion at least three similar works in the past five years.(20%)
b) Proposed key personnel, meets WWGC-5 requirements and above (30%)
c) Proposed machinery & equipment, meets at least WWGC-5 requirements and above (30%)
d) Cumulative volume of work for the past five years and the total minimum threshold conduct amount should be minimum of ETB 4,000,000.00 (20%)
e) filling with unreasonable high or low unit rate on a specific work items will lead to bid dismissal/rejection
f) Contractors who score technically 60% and above will proceed to the next level. However the organization have the right to scale up/down the technical cutting percentage.
g) Working experience with Action against Hunger will be considered as advantageous
3. Instructions
The contractors can compute for more than one lot but the offer can be provided for one won lot only.
Applicants should submit their company profile that contains the above-mentioned documents from 16 Jan 30/2024 up to Jan 31-30/2024 during office working hours (8:00AM to 5:00PM) at Tigray base filed office which located in mekelle city
For better information cell phone: 0913452219 Tigray base and 0984989905) Capital Logistic Department
S/N | Description | Unit | QTY | Woreda | Site Name | LOT # |
1 | Construction of VIP latrines having Four seats | Latrine blocks | 2 | Kolatembien | Guya Health centre | LOT-1 |
2 | Construction of 10m3 Elevated Tanker Stand with Plastic water Hank | no | 1 | Keyih Tekli | Workamba Health Centre | LOT-2 |
3 | Two Faucet Water Point Construction | no | 1 | Keyih Tekli | Workamba Health Centre | |
4 | Construction of VIP latrines having Four seats | Latrine blocks | 2 | Keyih Tekli | Workamba Health Centre | |
5 | HDPE Pipe line expansion for distribution System | no | 1 | Keyih Tekli | Workamba town | LOT -3 |
6 | Construction of Water point (WP) having Six Faucet | no | 1 | Keyih Tekli | Workamba town | |
7 | Construction of 10m3 Elevated Tanker Stand with Plastic water Tank | no | 1 | Endafelasi /mai-kenetal | Maykinetal Health Centre | LOT-4 |
8 | Construction of Water point(WP) having two Faucet | no | 1 | Endafelasi /mai-kenetal | Maykinetal Health Centre | |
9 | Construction of VIP latrines having Four seats in Health centres | Latrine blocks | 1 | Endafelasi /mai-kenetal | Maykinetal Health Centre | |
10 | HDPE Pipe line expansion for distribution System | no | 1 | Endafelasi /mai-kenetal | Mal-kinetal town | LOT -5 |
11 | Construction of Water point (WP) having Six Faucet | no | 3 | Endafelasi | Mal-kinetal town | |
12 | Construction pressure main pipeline from New BH to Existing pressure main LINE for Edagaarbi town | no | 1 | Endabatshma | Edagaarbi / Tsediya Kebelle | LOT -5 |
13 | Construction of Guard and Generator house at Edagaarbi BH (borehole) | no | 1 | Endabatshma | Edagaarbi / Tsediya Kebelle | |
14 | Construction of VIP latrines having Four seats | Latrine blocks | 1 | Endabatshma | Edagaarbi town, Amore Health centre | |
15 | HDPE pipe line expansion for Distribution System | no | 1 | Endabatshma | Edagaarbi town | LOT -6 |
16 | Construction of Water point (WP) having six Faucet | no | 2 | Endabatshma | Edagaarbi town |